Tuesday, May 3, 2011

RIX New HQ Update

The New Sydney Headquarters is complete and we are in the process of moving in....
Regards
RIX Blogger

Saturday, April 2, 2011

Rail Work - K2RQ

Drilling and soil nail installation has been continuing at Drilling continues at K2RQ with the final excavation completed.

Thursday, February 17, 2011

Road Work - Shotcrete and Soil Nail Embankment Stabilisation

Hi All,

RIX were called by our client to remediate this batter which had recently failed North of Sydney.
The slip was remediated with a Soil Nail Shotcrete Batter.
The works required removal of vegetation and loose rock(scaling). RIX drilling plant then drilled 125mm holes into the strata for 40 Soil Nails @ 5m x 20mm, 50mm diameter holes were also drilled into the rock shelf for 30 rockbolts @ 6m x 25mm diameter. 350m2 of shotcrete was also placed coloured to match the existing weathered rock.
Being a major road our Client asked the batter works be completed in 3 weeks...RIX were able to meet this deadline our Client is delighted with the works.

Monday, February 7, 2011

Rail Work - K2RQ

With the majority of this section of Soil Nail Wall at K2RQ complete, we are counting down the number of Soil Nails left to drill, grout and install before shotcreting.

Please take note of our flat consistent finish with its sharp an straight edges.

Our Clients have commented that our product is equal in aesthetics to a "Form Work" finish, but with considerable programme and budget benefits....


Thursday, October 28, 2010

Check out this video of our recent rail project....click an option below.

YouTube

The RIX Group completing "Stage 1" of a recent cold and rainy project. The project entailed over 100m² de-vegetation and scaling of loose material, the installation of 50 x 3m soil nails, the installation of 160m² of SL41 galvanised mesh and the placement of 25m³ of 25MPa Shotcrete. "Stage 1" was completed in 18hrs.

Sunday, October 24, 2010

Sharp and Straight Shotcrete Edges


Hi All,

The pool is now taking shape with the first spray successfully completed. Pictured is the pouring of the floor also visible is the sharp straight edges of a high class shotcrete finish.

Talk Soon

Team Nowra

Friday, October 8, 2010

Pool Ready for Steel Placement

Hi All,


With the top excavation completed and the lower pool drilled and bolted, a scaffold has been installed to assist the steel fixers in placing the steel reinforcement.


Talk Soon

Team Nowra