Friday, October 8, 2010

Pool Ready for Steel Placement

Hi All,


With the top excavation completed and the lower pool drilled and bolted, a scaffold has been installed to assist the steel fixers in placing the steel reinforcement.


Talk Soon

Team Nowra

No comments:

Post a Comment