RIX's Project Blog
Our Project Managers post photos and updates from RIX's latest projects.
Showing posts with label
shotcrete.steelfixing.finish.retaining.wall.rock.bolt.
.
Show all posts
Showing posts with label
shotcrete.steelfixing.finish.retaining.wall.rock.bolt.
.
Show all posts
Friday, October 8, 2010
Pool Ready for Steel Placement
Hi All,
With the top excavation completed and the lower pool drilled and bolted, a scaffold has been installed to assist the steel fixers in placing the steel reinforcement.
Talk Soon
Team Nowra
Older Posts
Home
Subscribe to:
Posts (Atom)