Hi All,
RIX were called by our client to remediate this batter which had recently failed North of Sydney.
The slip was remediated with a Soil Nail Shotcrete Batter.
The works required removal of vegetation and loose rock(scaling). RIX drilling plant then drilled 125mm holes into the strata for 40 Soil Nails @ 5m x 20mm, 50mm diameter holes were also drilled into the rock shelf for 30 rockbolts @ 6m x 25mm diameter. 350m2 of shotcrete was also placed coloured to match the existing weathered rock.
Being a major road our Client asked the batter works be completed in 3 weeks...RIX were able to meet this deadline our Client is delighted with the works.
Thursday, February 17, 2011
Monday, February 7, 2011
Rail Work - K2RQ
With the majority of this section of Soil Nail Wall at K2RQ complete, we are counting down the number of Soil Nails left to drill, grout and install before shotcreting.
Please take note of our flat consistent finish with its sharp an straight edges.
Our Clients have commented that our product is equal in aesthetics to a "Form Work" finish, but with considerable programme and budget benefits....
Thursday, October 28, 2010
Check out this video of our recent rail project....click an option below.
Option 1. RAIL PROJECT (No soundtrack)
The RIX Group completing "Stage 1" of a recent cold and rainy project. The project entailed over 100m² de-vegetation and scaling of loose material, the installation of 50 x 3m soil nails, the installation of 160m² of SL41 galvanised mesh and the placement of 25m³ of 25MPa Shotcrete. "Stage 1" was completed in 18hrs.
Sunday, October 24, 2010
Friday, October 8, 2010
Sunday, October 3, 2010
Rail Corridor Stabilisation
Hi All,
RIX were busy this weekend with Railway corridor works. Scheduled rail network shutdowns enabled routine cutting stabilisation to proceed.
Talk soon...
Labels:
cutting,
embankment,
rail,
shotcrete,
stabilisation
Tuesday, September 21, 2010
Top Level - Shotcrete Complete
today was the day to cover roughly 20 x 4m horizontal drains, our 140 x 4.2m or so DCP bolts and our 3tonne of SL81 (approx.).
The spray was completed successfully and our nossle man Rod gave it a consistent uniform finish, no lumps or bumps.
James cut the tops gun barrel to the green line. Overall a fantastic gun finish result, the client is very happy with program and product.
Now we start on the pool! Talk soon...