RIX recently took part in a project to rehabilitate a site that previously contained a service station. This site presented some interesting challenges as the soil was severely contaminated with Hydrocarbons. RIX partnered with the client in designing a solution that employed shotcrete and a gas vapour membrane to protect end users of the structure from any intrusion of toxic gases contained in the contaminated soil.Thursday, January 26, 2012
Shotcrete - Gas Vapour Intrusion Protection Pt1
RIX recently took part in a project to rehabilitate a site that previously contained a service station. This site presented some interesting challenges as the soil was severely contaminated with Hydrocarbons. RIX partnered with the client in designing a solution that employed shotcrete and a gas vapour membrane to protect end users of the structure from any intrusion of toxic gases contained in the contaminated soil.
Labels:
contaminated,
gas,
intrusion,
membrane,
service,
shoring,
shotcrete,
soil,
station,
vapor,
vapour
Location:
Canberra ACT 2601, Australia
RIX Install New Guard Rail Design Pt1
In the video you can see our specially designed excavator mounted drill mast, drilling the 65mm diameter holes through the rail and back under the road. The 24mm x 3m rockbolts will be installed through the custom built Double Posts of the Guardrail and grouted into the drill holes. The bolts have been designed to provide the posts with support in the incompetent ground, present onsite. It is important to note that the rock bolts have been fabricated with ductile steel as opposed to high tensile steel, this is to combat shock loading which will inevitably occur in the event of another vehicle hitting the rail.
Labels:
drill,
drilling,
embankment,
guardrail,
rail,
road,
rockbolt,
stabilisation
Location:
Sydney, NSW Australia
Tuesday, January 24, 2012
RIX Design & Build Custom Rock Drilling Rig Pt1
RIX were recently invited by our Client to complete works on the Jindabyne Dam Spillway. The project is part of the "Water For Rivers Program", which will restore environmental flows to the water starved Snowy River. The river originates from a height of 2.2km on the slopes of Mount Kosciuszko, Australia's highest mainland peak, draining the eastern slopes of the Snowy Mountains in New South Wales, before flowing through the Snowy River National Park in Victoria and emptying into Bass Strait 350km later.
RIX originally began works on the spillway in 2004 and were happy to return to install the final rockbolts and shotcrete.
Seen here is RIX's custom engineered Drilling Basket. This enabled us to drill the 100mm diameter,12m deep rockbolts into the granite surrounding the Spillway.
Seen here is RIX's custom engineered Drilling Basket. This enabled us to drill the 100mm diameter,12m deep rockbolts into the granite surrounding the Spillway.
Labels:
drill,
drilling,
shotcrete,
stabilisation
Location:
Snowy Mountains, NSW, Australia
Tuesday, May 3, 2011
RIX New HQ Update
The New Sydney Headquarters is complete and we are in the process of moving in....
Regards
RIX Blogger
RIX Blogger
Saturday, April 2, 2011
Thursday, February 17, 2011
Road Work - Shotcrete and Soil Nail Embankment Stabilisation
Hi All,
RIX were called by our client to remediate this batter which had recently failed North of Sydney.
The slip was remediated with a Soil Nail Shotcrete Batter.
The works required removal of vegetation and loose rock(scaling). RIX drilling plant then drilled 125mm holes into the strata for 40 Soil Nails @ 5m x 20mm, 50mm diameter holes were also drilled into the rock shelf for 30 rockbolts @ 6m x 25mm diameter. 350m2 of shotcrete was also placed coloured to match the existing weathered rock.
Being a major road our Client asked the batter works be completed in 3 weeks...RIX were able to meet this deadline our Client is delighted with the works.
RIX were called by our client to remediate this batter which had recently failed North of Sydney.
The slip was remediated with a Soil Nail Shotcrete Batter.
The works required removal of vegetation and loose rock(scaling). RIX drilling plant then drilled 125mm holes into the strata for 40 Soil Nails @ 5m x 20mm, 50mm diameter holes were also drilled into the rock shelf for 30 rockbolts @ 6m x 25mm diameter. 350m2 of shotcrete was also placed coloured to match the existing weathered rock.
Being a major road our Client asked the batter works be completed in 3 weeks...RIX were able to meet this deadline our Client is delighted with the works.
Monday, February 7, 2011
Rail Work - K2RQ
With the majority of this section of Soil Nail Wall at K2RQ complete, we are counting down the number of Soil Nails left to drill, grout and install before shotcreting.
Please take note of our flat consistent finish with its sharp an straight edges.
Our Clients have commented that our product is equal in aesthetics to a "Form Work" finish, but with considerable programme and budget benefits....
Subscribe to: